

If you prepare to invest a small-and-mid sized chemical factory or expand and modify the existing factory, and you are looking for design institute or design contractor or you do the design yourself, you may encounter these troubles. And Sower¡¯s advantages lie in providing you with practical, feasible solution to meet your different requirements at different stages.
¡¤ You only want to outsource partial task of the project to contractor, but the contractor enforces you to accept un-required service?
¡¤ You want to find a general contractor, but you have difficulty in finding a contractor with all required abilities for undertaking your project?
¡¤ Some contractors have rich experience in some fields, but they lack of experience in your specific field and unable to provide necessary helps to you?
¡¤ Some contractors develop from procurement companies, you may think they lack of experience in design and construction?
¡¤ Some contractors develop from design companies, you may think that they can not execute the procurement and construction effectively?
¡¤ Some contractors develop from construction companies, you may think their design ability is not strong enough.
¡¤ Some contractors outsource the project to several sub-contractors, which makes you feel worried?
¡¤ Some contactors give empty promises although they do not have profound knowledge in this field, which results in communication difficulty and slow progress?
¡¤ You want to outsource to famous design institute, but you may be refused due to the investment amount is too small?
¡¤ Some contractors are unable to meet your non standard requirements?
¡¤ The management flow of some contractors is irregular, departments buck each other and you have to face bureaucratic treatment?
¡¤ Some contractors treat the project indifferently because they feel they can not obtain big profit from your project?
¡¤ Some contractors authorize some project manager without enough experience for your project, which brings unexpected loss to your project¡±?
¡¤ The construction undertaken by some contractors is not in line with national regulation and you have to face countless penalty and continuous modification?
Etc..
¡¤ You have your own core production technology but you do not have the experience to execute it.
¡¤ You do not have enough experience in project management so it is inevitable you will spend a lot of wronged money and exceed the budget unconsciously.
¡¤ You lack of experience in project management and it is delayed due to a lot of unexpected things, as a result, the whole project is delayed unconsciously?
¡¤ You have to deal with hundreds of suppliers, and a small problem will give rise to chaos?
¡¤ The machinery of one production line comes from various manufacturers, it is a headache for you to do the installation and commissioning of the whole plant, isn¡¯t it?
¡¤ Procurement, design, construction and finance control are too complex to know what should be started with?
¡¤ There is no completed project management system nor contingency plan.Management is at mass?
Etc..